供求贴
外贸人 供求贴
| 搜索

Steve Liu
Steve Liu 2024-02-23 14:39:41

76-300mm Hole Diameter Ground Anchor Drilling Rig
76-300mm Hole Diameter Ground Anchor Drilling Rig

供应76-300mm Hole Diameter Ground Anchor Drilling Rig 0-150m Depth Multifunctional Drilling Rig

It is widely used in fields such as construction, highways, railways, water conservancy, electric power, tunnels, foundation pits, slopes, and military engineering.

Suitable for rock drilling in drift, egg, grel layers, and layers covered by fractured and strongly weathered rocks, it can particularly demonstrate its efficient and stable performance. It can quickly and efficiently drill through complex formations and has broad application prospects in various geotechnical anchoring projects.

Technical specifications

76-300mm Hole Diameter Ground Anchor Drilling Rig 0-150m Depth Multifunctional Drilling Rig
Power ZML-160 electric type engine 55(Kw)
ZML-160 diesel type diesel 74(Kw)
ZML-160 double power engine 55(Kw)
diesel 74(Kw)
ZML-160 electric work diesel walk engine 55(Kw)
diesel 37(Kw)
Power head Hole diameter 76~300()
Hammer CIR,DHD
Rock broken way percussion-rotary
Hole depth 0-150(m)
Drill rod type Φ76/Φ89*1500/2000/3000
Power head rotary speed 35-70(rpm)
Power head max torque 8000(N.m)
Power head max stroke 3500()
Max pulling force 80(KN)
Whole machine Dimension 6600*2000*2700
Air consumption 9~22(m3/min)
Drill angle 0-360(°)
Rotary angle 360(°)
Vice stroke 1000()
Rated pressure 25(Mpa)
Climbing ability ≦ 25(°)
Horizontal height 3014mm
Weight About 9500kg

Main features

Dynamic system

The whole machine can replace different power heads(DTH, top drive, coring) according to construction needs, making construction more convenient, reducing costs, and doubling production;

Rotating arm structure

By adopting a rotary arm structure, the operating range after one positioning is greatly increased. The drilling arm can rotate about 360 °, achieving any angle construction;

Control costs

By using pilot valves and variable piston pumps with load feedback systems, it has the functions of power protection and pressure cut-off. While effectively adapting to the total flow demand of various executing components, it achieves the best power matching under different working conditions and maximizes energy conservation;

Security measures

When drilling, the wind and water linkage system is used to reduce the large amount of dust generated during tunnel construction. While drilling, the crushed stones are washed out of the hole through high-pressure water, reducing the problem of sticking during drilling, achieving the goal of rapid drilling, improving work efficiency, and reducing construction costs;

Pipe shed construction

Both single rod drilling and drilling with casing can be used. When the geological situation is complex and there is collapse, the casing construction method can be adopted, which means the outer casing and inner drill rod drill to the required depth at the same time. Firstly pull out the inner rod, then pull in the steel pipe, finally pull out the outer casing;

Emergency rescue

During the construction process, in case of danger, geological exploration, geological improvement, and support operations in the danger zone can be quickly completed. If the underground space is obstructed by collapse, casing operations can be used to quickly transport air, water, and other rescue materials to the trapped personnel;

641次展示,194次查阅
Steve Liu 发布人
Steve Liu(中国) 四川钻神 外贸经理|供应商
© 2023 52Bline.com 版权所有|上海义缘网络科技有限公司|虹梅路2007号远中产业园3期1号楼705室|用户协议 沪公网安备 31010402010227号